CalPlant I Gears Up For First Board

CalPlant I, the new rice straw-based MDF plant in Willows, Calif.,is starting up and commissioning all areas of the mill. This includes the straw preparation building, where 20 loaded straw trailers have been staged; the refiner and dryer area, where dust collection and pneumatic transfer is undergoing final calibration; the first truckload of pMDI glue has arrived; forming and pressing is beginning pneumatic transfer of fiber and commissioning of the press sizing systems; commissioning of the intermediate stacking, sanding and sawing system; and likewise for the spark detection and quenching system. First board production is anticipated during the first week of November.

RELATED ARTICLES

CALPLANT I NEARS THE FINISH (OR STARTING) LINE

CALAG RICE STRAW MDF PLANT

 

 

Latest News

Forest Products Industry Says Goodbye To Walter

Walter Jarck, whose career in the forest products industry spanned 65 years and ranged from logging machinery to engineered wood products, died January 3, surrounded by his children, in North Wilkesboro, NC. He was 92.

Oregon Truckers File Suit Against State

Rob Freres, president of Oregon-based Freres Engineered Wood, a manufacturer of lumber, veneer, plywood and mass timber, has thrown in his support for a lawsuit filed by the Oregon Trucking Assn. and three Oregon-based trucking companies against the state of Oregon for overcharging truckers under the weight-mile tax.

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!