Dear Fred, From Kenneth
Article by Rich Donnell, Editor-in-Chief, Panel World March 2022
While reading a draft of this issue’s cover story on Roseburg’s new LVL plant in Chester, SC, representing Roseburg’s first ever greenfield project in the South, I glanced at the letter that I’ve always kept on the bulletin board up and behind my iMac monitor. The bulletin board is mostly tacked with editorial planning and editorial style information, but this letter always appealed to me and I put it up there instead of filing it away into neverland.
I’m the second person who felt the letter was worth keeping. The first person was the late Fred Fields, who worked for and eventually bought the panel machinery manufacturing company, Coe Manufacturing. I worked with Fields on writing and publishing his book, “My Times With Coe,” which came out in 2010. Fields, living in Portland, Ore., opened his massive files to me, and one thing I uncovered was a letter—written to Fields on December 4, 1964 by Kenneth Ford, the owner and president of Oregon-based Roseburg Lumber Co., as the company was called then. Ford signed it as Kenneth W. Ford.
When Fields first traveled to the Northwest in 1952 for Coe one of his first projects was helping with the installation of a Coe lathe and dryer that Ford and Roseburg had purchased for Roseburg’s first plywood plant to be built in Dillard, Ore. That’s when Ford and Fields met for the first time and they struck up a tight, albeit sometimes sparring, business and personal relationship that lasted until Ford’s death in 1997.
By 1964, Fields was living in Portland and working out of Coe’s new plant in Tigard, Ore. The letter reveals that Ford was thinking seriously about building a plywood plant in the Southern U.S., and that he understood that Fields had said the profitability for Roseburg from such an endeavor “looked good.” However, Ford added, his accountant had worked up some numbers for a possible plant in the South.
Ford wrote, “The report which they prepared is not what you would call lucrative. I am enclosing a copy of this report and wish you would please go over same and if you find that it is grossly in error…see if we can get the report corrected.”
Apparently it was never “corrected” enough and Ford already had lots of other projects on his plate as Roseburg continued to build plants in the Northwest, including a massive plywood plant at Riddle, Ore. that came on in the early 1970s.
Fields, who died in late 2011, the year after the book came out, obviously felt the letter from his friend was a keepsake, and upon completing our collaboration on the book generously invited me to possess it along with some of his other materials. Being a sports enthusiast, I’m all about sports memorabilia, and while it’s not sports I’ve always viewed this letter in a similar special light, involving two legends of the trade.
At the upcoming PELICE in Atlanta, there will be discussion about Roseburg’s new LVL plant in South Carolina, and the company’s growing interests far away from its Oregon home base. I’ll be wondering, what if Kenneth Ford and Roseburg had built that plywood mill, or two or three or a half dozen of them in the South?
Latest News
Forest Service Says 4FRI Is Still Alive
Following its cancellation of the Phase 2 Request for Proposal (RFP) and bid selection in September, which caught everybody by surprise, the Forest Service “has gone back to work” on how to move forward with stewardship and treatment of the 520,000 acres that was included in Phase 2, which was part of the 4 Forests…
CalPlant I Regroups, Sale Is Possible
CalPlant I, LLC, which took 25 years to develop and build a rice straw-based medium density fiberboard plant and produce its first board late last year in Willows, Calif., has voluntarily filed for Chapter 11 bankruptcy protection and intends to conduct a court-supervised sale process…
NewLife Gains Full Production
NewLife Forest Restoration has ramped up production at its new engineered wood products plant in Bellemont, Ariz., while also increasing forest restoration work in service of its 4 Forest Restoration Initiative (4FRI) Phase 1 Forest Service stewardship contract that seeks to thin and treat more than 300,000 acres at risk of…
Labor, Materials Issues Cause Project Delays
The same labor availability issues that have plagued forest products manufacturers since the COVID pandemic began are also plaguing builders as the economy seeks to rebound. According to a survey of more than 2,000 construction companies, both hourly and salaried employees are…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!