First CLT Office Opens In DC

Opened in fall 2022, the first mass timber commercial building in the U.S. capital city features more than 108,000 sq. ft. of mass timber. The building is an innovative retrofit at 80 M Street SE in Washington, DC: Termed an overbuild—extra stories atop an existing building—the expansion features three floors, where columns of mass timber are visible from the interior.

The project used 1,300 tons of CLT, with the mass timber addition sized at 108,000 sq. ft. of the overall 286,000 sq. ft. space. The developer of the project is Columbia Property Trust; architect is Hickok Cole. Engineering firm Arup performed the retrofit, and the property opened late September. First tenants are the American Trucking Assn. and BP America. Nordic Structures supplied the glulam beams and columns used in the project, and Katerra supplied the CLT.

Latest News

Carroll Is COO At Swiss Krono

Swiss Krono Group appointed Steve Carroll as its COO and Technical Director for U.S. operations at Barnwell, SC. Carroll comes to Swiss Krono from Arauco North America where he most recently served as director of the Grayling, Mich. operations. He brings to Swiss Krono more than 30 years of experience in…

CPA, APA Leaders Size Up Situation

Leadership from two of the major primary panel production associations provided 2022 year-end reports, while also looking ahead to 2023 and both pointed to economic issues moving forward. “This year (2022) was more ‘back to normal,’ as the COVID pandemic was mostly in the rearview mirror. There were…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!