German Firm Debuts Wooden Turbine Blades

Wind turbine blade manufacturer Voodin Blade Technology GmbH recently announced the first prototype installation of its 19.3 m wooden wind turbine blades on an existing wind turbine in Breuna, Germany.

Most existing wind turbine blades are made of fiberglass and carbon fiber bound together with epoxy resin, materials that are difficult to recycle, unreusable and expensive to break down. Voodin Blade Technology’s wooden wind turbine blades are made of LVL, which is sustainable and recyclable.

With the first generation of wind turbine blades beginning to reach the end of their average 20-25 year life cycles, Voodin Blade Technology officials say they are providing a more sustainable turbine blade solution that ensures more sustainable wind energy production in the future.

Hundreds of tests during the past two years to perfect the blade material show the new wooden blades are even more durable than existing fiberglass blades, show fewer fatigue characteristics and are able to endure all kinds of onshore weather conditions, explains Jorge Castillo, co-founder of Voodin Blade Technology. The company is building new prototypes, including bigger 60 m and 80 m blades as a next step.

Latest News

Roseburg Orders Super-Long Dryer

Roseburg Forest Products has ordered a veneer dryer for its plant in Coquille, Ore. from Westmill. At 204 ft. length, the dryer will be the longest veneer dryer in North America, according to the participants. The 6-deck, steam-heated jet dryer is designed to dry the heaviest moisture Douglas fir, hemlock and spruce…

The Business At Hand

Article by Rich Donnell, Editor-In-Chief, Panel World January 2023 – Some forecasts coming out of APA—The Engineered Wood Association annual meeting in October painted a rather bleak economics picture for 2023. It was no surprise, given the already downward trending in housing…

Boise Cascade Announces New SC Distribution Facility

Boise Cascade has announced plans to expand its South Carolina operations with a new facility in Walterboro, with a $9 million investment that will create 30 new jobs. This new facility marks Boise Cascade’s first distribution location and second facility…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!