LOGSTACKERS HEAD TO CANADA

Allied Systems Co., parent company for Wagner Logstackers, is excited about its recent shipments of two new 60 ton operating
capacity Wagner Logstackers into Canada. Wagner has long been known for its durable single pass Logstacker, and the new generation models build on that legacy by adding a number of new improvements coveted by operators and maintenance staff alike, such as:

  • Seriously fast hoist speeds
  • Lighted ground level service bay for easy routine maintenance
  • Lighted stairways for safe and easy access on and off the machine
  • Newly designed cooling package with easy maintenance access
  • More spacious and comfortable cab with improved visibility
  • Longer component service life and maintenance intervals

The four-wheel drive Wagner L4120 maintains traction in the toughest conditions while the two-wheel drive L120 is perfect for improved yards, and boasts even better fuel efficiency and a tighter turning radius. Whether you’re handling cut-to-length or treelength logs, Wagner Logstackers can handle it all quickly, efficiently and for the lowest total cost.

Wagner Logstackers are designed and built in Sherwood Ore., USA.

 

Latest News

APA Selects New President

Mark Tibbetts has joined the staff of APA—The Engineered Wood Assn. as he transitions to the president position July 1, when Ed Elias retires. Tibbetts was selected by the group’s Board of Trustees through a lengthy search process…

OSB Output Had Uptick In 2020

North America structural panel production was 33.201 billion SF in 2020, down 0.8% from 2019, according to APA—The Engineered Wood Assn. Both the U.S. and Canada showed slight declines. However in the U.S., OSB production was…

Starwood Orders Thin-Board Plant

Turkish wood-based materials manufacturer Starwood has ordered its second thin-board plant for the production of thin MDF/HDF to be built near Inegöl. The new plant is designed to run at 2,000 mm/s. The core of the scope of supply is the…

Bamboo Mill Gains Steam

Resource Fiber, a leader in efforts to manufacture commercial bamboo products, plans to establish its first full-scale production plant in Sulligent, Ala. Resource Fiber plans to invest $3.6 million in the Lamar County facility, where it will produce engineered…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!