LP Goes With Biele For Manitoba Shake Line

Louisiana Pacific and Biele Group have successfully implemented their first project—a shake profile production line in Swan Valley, Manitoba, Canada. This investment is part of the company’s expansion plans for siding products within their LP SmartSide trim and siding brand.

The project consists of a fully automatic shake profile production line that is fed with 8×4 ft. orientated-strand board panels for several post-processing processes to get different sized shakes. The Biele line feeds the mother board and cuts into multiple pieces that will be profiled, painted and packaged according to different recipes.

According to LP’s Engineering Project Manager Danaillie Woodfine, “Prior to adding the shake line in Swan Valley, LP had a shake line in Roaring River, North Carolina. Customer demand for the shake product was outpacing the capacity of the Roaring River line. The new line includes more automation and an increased line speed that is capable of twice the production of the Roaring River line. This increase capacity will allow LP to meet future customer demand.”

Latest News

Raute PRS R5 Proving Itself

Raute introduced its Panel Repair Station (PRS) R5 the plywood industry in 2020. Soon there will be 13 units operating in North America. Measuring 33 ft. by 26 ft., the R5 is no larger than most manual repair cells. It requires no foundations, meaning it can be up and running within two weeks of delivery…

India’s Greenpanel Grows With MDF

India’s largest MDF manufacturer, Greenpanel Industries Ltd., has ordered its third MDF plant from Dieffenbacher. The new thin-board line based on Dieffenbacher’s smart plant concept, CEBRO, will be added in Routhusuramala, Andhra Pradesh. That’s the same site where Greenpanel commissioned a Dieffenbacher MDF line with a 56 m long CPS, the longest continuous press in…

Kronospan Announces Further Expansion At Alabama Site

Kronospan will begin construction of a new OSB manufacturing plant on its 460 acre site in Oxford, Ala. The new facility, employing 125, will have a footprint composed of 44 acres of new development, including substantial areas designated for product storage, rail spur and loading docks. Groundbreaking for the $350 million facility is scheduled for later this year…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!