No One Injured In Plum Creek MDF Plant Explosion
The fire appeared to have been contained to one line of the plant, said Columbia Falls firefighter Karl Weeks. The call for the fire came out at 6:09 a.m. and firefighters were off the scene at 11:15 a.m. Weeks said there were multiple spot fires as a result of the explosion inside the massive plant. The facility underwent a multi-million dollar renovation after a fire and explosion damaged the building in June of last year.
The cause of this fire remains under investigation. Whitefish responded with mutual aid and about 15 firefighters total fought the blaze, Weeks said.
Plum Creek spokeswoman Kathy Budinick said the fire apparently originated in an area of line one that holds the fiber before it enters the line. “The fire suppression system worked as intended,” she said.
The plant has two lines and line two is up and running, Budinick said. Line one will remain down until repairs can be made, but Budinick said there was minimal damage to the plant itself. She said the fire suppression system also needs to be recharged.
From Hungry Horse News (2015)
Latest News
Raute PRS R5 Proving Itself
Raute introduced its Panel Repair Station (PRS) R5 the plywood industry in 2020. Soon there will be 13 units operating in North America. Measuring 33 ft. by 26 ft., the R5 is no larger than most manual repair cells. It requires no foundations, meaning it can be up and running within two weeks of delivery…
India’s Greenpanel Grows With MDF
India’s largest MDF manufacturer, Greenpanel Industries Ltd., has ordered its third MDF plant from Dieffenbacher. The new thin-board line based on Dieffenbacher’s smart plant concept, CEBRO, will be added in Routhusuramala, Andhra Pradesh. That’s the same site where Greenpanel commissioned a Dieffenbacher MDF line with a 56 m long CPS, the longest continuous press in…
Kronospan Announces Further Expansion At Alabama Site
Kronospan will begin construction of a new OSB manufacturing plant on its 460 acre site in Oxford, Ala. The new facility, employing 125, will have a footprint composed of 44 acres of new development, including substantial areas designated for product storage, rail spur and loading docks. Groundbreaking for the $350 million facility is scheduled for later this year…
Find Us On Social
Newsletter
The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.
Subscribe/Renew
Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!