Plants Get Smart With Dryer Infeed

 

Sweed’s recently patented “Smart Pause” technology allows dryer infeed operators additional time to address misfeeds or other veneer feeding issues, while permitting the continued operation of the veneer dryer, thus maximizing dryer fill rates. Several plants with current and pending projects will be realizing the benefits of Smart Pause.

Georgia-Pacific in Taylorsville, Mississippi recently commissioned a new 4-deck dryer equipped with Sweed’s Smart Pause infeed. Soon to come for G-P are two new installations in early 2020: a 4-deck and a 6-deck dryer, both equipped with Smart Pause infeed. Also joining the Smart Pause trend is Weyerhaeuser in Emerson, Arkansas, which has a pending dryer installation slated for spring 2020.

Sweed’s Smart Pause dryer infeed functions independently of the veneer dryer. Utilizing additional hardware and innovative software and controls designed by Sweed, each deck of the infeed roll case is operated individually with timing and variable speed controls, providing a platform for the program to manage veneer under normal and abnormal conditions, without affecting the performance of the dryer itself. The Smart Pause program is initiated upon the detection of missing sheets, and/or by the operator who has identified an issue. In either case, the operator has a period of up to 20 seconds (depending on feed speeds) to fix the misfeed and speed the infeed, allowing veneer to “catch-up” and be lapped prior to dryer entry.

 

Latest News

Raute PRS R5 Proving Itself

Raute introduced its Panel Repair Station (PRS) R5 the plywood industry in 2020. Soon there will be 13 units operating in North America. Measuring 33 ft. by 26 ft., the R5 is no larger than most manual repair cells. It requires no foundations, meaning it can be up and running within two weeks of delivery…

India’s Greenpanel Grows With MDF

India’s largest MDF manufacturer, Greenpanel Industries Ltd., has ordered its third MDF plant from Dieffenbacher. The new thin-board line based on Dieffenbacher’s smart plant concept, CEBRO, will be added in Routhusuramala, Andhra Pradesh. That’s the same site where Greenpanel commissioned a Dieffenbacher MDF line with a 56 m long CPS, the longest continuous press in…

Kronospan Announces Further Expansion At Alabama Site

Kronospan will begin construction of a new OSB manufacturing plant on its 460 acre site in Oxford, Ala. The new facility, employing 125, will have a footprint composed of 44 acres of new development, including substantial areas designated for product storage, rail spur and loading docks. Groundbreaking for the $350 million facility is scheduled for later this year…

Find Us On Social

Newsletter

The monthly Panel World Industry Newsletter reaches over 3,000 who represent primary panel production operations.

Subscribe/Renew

Panel World is delivered six times per year to North American and international professionals, who represent primary panel production operations. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative. Contact us today!